TRAININGS > MRP - Material Requirements Planning Expert Training

MRP - Material Requirements Planning Expert Training
450.00 + VAT
Duration 3 Day(s) / 21.0 Hour(s)
MRP.201.E
15

Eğitim ücretlerimizi iba@caniaserp.com adresine mail göndererek öğrenebilirsiniz.

OVERVIEW

WHY PARTICIPATE?

Material Requirements Planning - Expert Training is aimed to enable the participants to learn;

- Processes related to the Material Requirement Planning, Managing Material Requisitions, Plan Orders, etc. and their corresponding available operations in the system.

- Different integration points of Material Requirements Planning Transaction with other transactions in CaniasERP.

TARGET AUDIENCE

- Users assigned with Material Requirements planning tasks

- MRP Planner

- MRP Controller

- ERP Project Managers / Project Officers

- Owners and Partners

PRE-REQUISITES

Pre-Training Preparation: Participants are expected to go through the related training content available on web portal or the system.

Level of Knowledge:

- Prior participation in BAS - Basic Transaction End User Training is highly desirable.

- Having basic knowledge of production, sales, purchase and inventory management.

Required Materials: Notebook

TARGET COMPETENCIES

- MRP - Material Master Transaction integrations

- Independent Requisition Documents

- Plan Orders

- Control and Reporting Process of MRP Results

- Basic Variables Affecting MRP Process

- MRP Cockpit

PURPOSE OF TRAINING

At the end of MRP - Material Requirements Planning Expert Training, the participants will be able to;

- Produce independent requirement documents,

- Create, edit and schedule production plans,

- Manage Inventory needs analysis screen management,

- Run MRP for single or multiple material list,

- Run MRP over the net change table,

- Understand the basic changes affecting MRP process and conducting MRP according to these changes,

- Control and analyze MRP results,

- Convert MRP plans into requisition requests and vice-versa.

TRAINING METHODOLOGY

- MRP - Material Requirements Planning Expert Training is held in a training room. However, training is provided via teleconference for the offices in other cities.

- After the theoretical sessions, dummy records are used for practice by the participants.

- Participants are allowed to create their own dummy records for practice purposes.

- Training index and content are shared as printed and/or digitally with the participants to provide a lasting learning experience.

TRAINING INDEX

MRP.201.E - MRP - Material Requirements Planning Expert Training


1 - MRP Definition and Flow Diagram

1.1 - Material Requirements Planning Concept

2 - MRP Material Master Card Relations

2.1 - Material Master & MRP entegration

3 - Independent Requisition Documents

3.1 - Creating New Independent Requisitions

3.2 - Updating Existing Independent Requisitions

3.3 - Deleting Existing Independent Document

A - Workshop

4 - Plan Order

4.1 - Creating New Plan Order

4.2 - Updating Existing Plan Order

4.3 - Actualizing & Scheduling (Backward, Forward) Plan Orders

5 - MRP Run

5.1 - MRP Run Single Material

5.2 - MRP Run Multiple

5.3 - Running MRP From Batch File

5.4 - Listing & Managing Net Change Entries

B - Workshop

6 - Control and Reporting Process of MRP Results

6.1 - Checking Stock & Requirement Analysis

6.2 - Analysing Source Based Supply & Demand Documents

6.3 - Analysing Supply & Demand Documents

C - Workshop

7 - Basic Variables Affecting MRP Process

7.1 - Running MRP With Different Process Type

7.2 - Running MRP With Considering Reservation

7.3 - Running MRP With Different Lot Sizing Methods

7.4 - Running MRP With Different Lot Optimization Methods

7.5 - Running MRP With Different Scheduling Type

7.6 - Running MRP With Reorder Level Concept

7.7 - Running MRP With Safety Stock Level

7.8 - Running MRP With Supply Group Types

7.9 - Running MRP With Considering Scrap Quantity

7.10 - Running MRP With Special Order Concept

7.11 - Running MRP With Different Special Procurement Keys

7.12 - Running MRP With Merge Plan Concept

7.13 - Running MRP With Alternative Material Usage Concept

8 - MRP Cockpit

8.1 - MRP Cockpit Display

9 - Converting Plan / Requsition

9.1 - Converting Plan to Requsition / Requsition to Plan

D - Evaluation & Exam
;