OVERVIEW

MODULE DESCRIPTION

​​​​​​​The steps required to complete production, assembly or disassembly activities and the resources required in these steps are defined on the system with the caniasERP Routing Management (ROU) module. 

This module handles the information on which operations to perform in which order and which tools and work centers to use in addition to which materials will be used in which operation.

The work centers where the operations within the scope of the Routing Management module are carried out, the machine and personnel capacities in these work centers, the cost/cost types of the machines and the personnel are extremely important in terms of capacity planning and production costs. Working hours and the capacity of work centers directly affect the scheduling and cost of production orders. In this module, the factory calendar and work schedule can be used for all work centers, and each work center can be customized.

PRE-REQUISITES

Pre-Training Preparation: Logging in with the information provided for EDU jnlp

Level of Knowledge:

- BAS - Basic Transaction Training

- BOM - Bill of Material Training.

Required Materials: Notebook

TRAINING OBJECTIVES

At the end of the Route Management - Expert Training, the participants will be able to;

- Track “Route Information” and “Work Center” records on the system,

- Define operations type, activities and tools,

- Assign the Work Center Responsible.


TRAINING INDEX

ROU.201.E - ROU - Route Management Expert Training


1 - Route Management

1.1 - Route Management

1.1 - Common (General) Rout Approach

2 - Route General Management Process

2.1 - Search Route Info

2.2 - Show Route Info

2.3 - Update Route Info

2.4 - Create Route Info

2.5 - Print Route Info

2.6 - Delete Route Info

2.7 - Create Route Info (Standart)

2.8 - Create Route Info (Alternative)

2.9 - Create Route Info (Variant)

2.10 - Create Route Info (Similar)

2.11 - Create Route Info (Demontage)

3 - Variant Processes in Route Management

3.1 - Variant Option Matching

A - Workshop

4 - Route Batch Management Process

4.1 - Changing Batch Work Centers from Routes

4.2 - Changing Batch Tools from Routes - Search

4.3 - Changing Batch Tools from Routes - Update

4.4 - Changing Batch Tools from Routes - Delete

5 - Material Production Durations Update Process

5.1 - Check Update Material Data for MRP

6 - Parallel Operations in Routes (Equal or Not)

6.1 - Check Parallel Operations (Equal or not)

7 - Quantity and Cost Parameters of Activities in Routes

7.1 - Check cost and quantity behaviors of Activites

8 - Operation Control Types Management Process

8.1 - Check Operation Control Type behaviors

9 - Standard Text Key Based Machine Parameters Process

9.1 - Standard Text Key Based Machine Parameters

10 - Workcenter Management Processes

10.1 - Create New Work-Center

10.2 - Check Easy Confirmation (PRDT03) Settings

10.3 - Check Calendars

11 - Capacity Groups Management Process

11.1 - Show Capacity Groups

12 - Reporting Processes

12.1 - Search Utilization of Work Centers

12.2 - Print Utilization of Work Centers

13 - Product Configurator Management Processes

B - Workshop

C - Evaluation & Exam
;