TRAININGS > PRD - Production Planning And Control Expert Training

PRD - Production Planning And Control Expert Training
600.00 + VAT
Duration 4 Day(s) / 28.0 Hour(s)
PRD.201.E
15

Eğitim ücretlerimizi iba@caniaserp.com adresine mail göndererek öğrenebilirsiniz.

OVERVIEW

MODULE DESCRIPTION

caniasERP - Production Management (PRD) module contributes to the optimization of all production processes of enterprises with its adaptability. This module, which allows single-level or multi-level production, enables the production plans created by the Material Requirements Planning module to be converted into production orders and managed. The Production Management module, which can be integrated into the entire system flawlessly, ensures a successful data flow.

PRE-REQUISITES

Pre-Training Preparation:

Participants are expected to go through the related process documentation available on web portal or the system.

The installation should have been made with the EDU jnlp link shared on the participation form.

Level of Knowledge:

- Prior participation in BOM - Bill Of Material Expert Training

- Prior participation in ROU - Route Management Expert Training

- Prior participation in INV- Inventroy Management Expert Training

- Should have basic Production Management and Planning knowledge.

Required Materials: Notebook

TRAINING OBJECTIVES

At the end of "Production Planning And Control - Expert Training", the participants will be able to;

- Manage production processes, operations, work orders and create all reports covering them according to analysis needs through the caniasERP system,

- Create production orders in different concepts  with different types of work orders,

- Apply External Operations Management concept,

- Apply the concepts of Easy Production Order Confirmation, Fast Confirmation and Mobile Work Order creation.


TRAINING INDEX

PRD.201.E - PRD - Production Planning And Control Expert Training


1 - Production Management

1.1 - Production Management

2 - Create and schedule a normal production order

2.1 - Update existing production order

2.2 - Delete production order

2.3 - Create and schedule a normal production order

2.4 - Check components and operations of normal production order

2.5 - Good issues for normal order

2.6 - Receipt for normal order

2.7 - Byproduct Management in Production Orders

2.8 - Resource Management in Production Orders

2.1 - Standart calculation

2.2 - Attachments

2.3 - Scheduling, Components, and Operations in Normal Production Orders with delivery factor.

2.4 - Planning Serial Number in Production Orders

A - Workshop

3 - Normal Production Order Planning

3.1 - Confirmation and correction for normal order

3.2 - Confirmation and correction for normal order with delivery factor

3.3 - Confirmation and correction for normal order with retroactive components

3.4 - Calculating of Retroactive by-Product Quantity while Confirming Operation

3.5 - Confirmation and correction Automatic Issue and Operational Issue

3.6 - Confirmation and correction Automatic Receipt

3.7 - Confirmation and correction with Batch Numbers

3.8 - Confirmation and correction with Serial Numbers

3.9 - Confirmation Metrics

3.10 - Rework Quantity while Confirming Operation

B - Workshop

4 - Collective Production Order Planning

4.1 - Create and schedule a collective production order

4.2 - Good issues for collective order

4.3 - Receipt for collective order

4.4 - Collective order, schedule, components and operations with delivery factor

4.5 - Confirmation and correction for collective order

4.6 - Confirmation and correction for collective order with delivery factor

4.7 - Confirmation and correction for collective order with retroactive components

4.8 - Check semi prod quantity while giving confirmation

4.9 - Check components and operations of the collective production order

C - Workshop

5 - Combined Production Order Planning

5.1 - Create and schedule a combined production order

5.2 - Check components and operations of the combine production order

5.3 - Good issues for combine order

5.4 - Receipt for combine order

5.5 - Confirmation and correction for combine order

5.6 - Confirmation and correction for combine order with retroactive components

D - Workshop

6 - Simple Demontage Production Order Planning

6.1 - Create a simple demontage production order

6.2 - Create a complex demontage production order

6.3 - Confirmation and correction for demontage order

6.4 - Confirmation and correction for demontage order with delivery factor

6.5 - Confirmation and correction for demontage order with retroactive components

E - Workshop

7 - Fast Confirmation

7.1 - Confirmation and correction with Confirmation Number

7.1 - Detail Confirmation and correction with Confirmation Number

8 - Easy Production Order Confirmation

8.1 - Easy Production Order Confirmation

8.2 - Start - End First Article

8.3 - Check behavior of Workcenter Type while Starting or Ending a job

8.4 - Selecting Scheduled Jobs

8.5 - Check Location of Workcenters

8.6 - Operational Issue while Starting an operation.

8.7 - Automatic Receipt while ending an operation.

8.8 - Ending an operation with Serial Numbers.

8.9 - Ending an operation with Batch Numbers.

8.1 - Idle Failure Management

8.2 - Repeated Setup for Operations

F - Workshop

9 - Creating Production Order From Production Plan And Sales Order

9.1 - Converting Production Plan to Production Order

9.2 - Create Production Order from Sales Order

10 - Production Reports

10.1 - Production Order Network

10.1 - Production Confirmation Report

10.2 - Workcenter Report

10.3 - Scrap and Rework Report

10.4 - Failure Report

10.5 - Operation Report

10.6 - Production Confirmation Report

10.7 - Production Order Report

10.8 - BOM and Order Items Comparison

11 - External Operation Management Process

11.1 - External Operation Management Process

11.2 - Create Purchase Order for External Operation

11.3 - Creating Purchase Requisition for External Operation

11.4 - Check external operation products will be come from Vendor

11.5 - Check provided parts will be sent to Vendor

G - Workshop

12 - Combined Operations Process

12.1 - Combined Operations Process

12.2 - Confirmation and correction Combined Operations

12.3 - Retroactive Material Management for Combined Operations

12.4 - Failure Management for Combined Operations

12.5 - Activity Management for Combined Operations

12.6 - Easy Confirmation Combined Operations

12.7 - By-Product Management in Combined Operations

H - Workshop

I - Evaulation & Exam
;