TRAININGS > CAP - Capacity Planning Expert Training

CAP - Capacity Planning Expert Training
300.00 + VAT
Duration 2 Day(s) / 14.0 Hour(s)
CAP.201.E
15

Eğitim ücretlerimizi iba@caniaserp.com adresine mail göndererek öğrenebilirsiniz.

OVERVIEW

MODULE DESCRIPTION

caniasERP – Capacity Management (CAP) module ensures that production orders within a certain period are given a deadline according to (based on) the resource constraints in production and are scheduled according to generally accepted methods. 
This module can be operated with different criterias depending on production order type and work center. Multiple planning results can be stored on the module and these results can be compared with previous plans. The performance of different strategies used in capacity planning can be compared through this feature.

There are multiple Scheduling Algorithms options supported by the Capacity Management module. Scheduling can be done by developing the most suitable algorithm for the needs of the enterprises. The extent to which scheduling, and optimization will be detailed is entirely left at the user's initiative. Different types of planning methods can be developed for different plants in the enterprise.

PRE-REQUISITES

Pre-training Preparation: Completing set-up by the shared EDU jnlp link in the participation form.

Knowledge Level:

- PRD – Participation in Production Planning and Control Training

- BOM - Participation in Bill of Materials ManagementTraining

- ROU - Participation in Routing Management Training

Necessary Materials: Notebook

TRAINING OBJECTIVES

At the end of CAP - Capacity Planning Expert Training, the participants will be able to;

- manage Business Centers and Calendars and capacity groups,

- use advanced scheduling algorithms,

- plan operations and resources effectively,

- perfom manual scheduling and delay analysis,

- prepare optimization,

- create Load Distribution Report for Responsible and Resources.




TRAINING INDEX

CAP.201.E - CAP - Capacity Planning Expert Training


1 - General Capacity Planning

1.1 - Capacity Management

2 - Advanced Scheduling

2.1 - Scheduled By Order

2.1 - Advanced Scheduling and Optimization

2.1 - Check dispatch scheduling

2.2 - Check cap groups for scheduling

2.3 - Check infinite capacity workcenters

2.4 - Check discontinuous workcenters scheduling

2.5 - Check resource scheduling

2.6 - Check the other algorithms with algorithm parameters

2.7 - Check started operations scheduling

2.8 - Check manually assigned operations scheduling

2.9 - Reporting of Capacity Run Results Based on Workcenter

3 - Setup optimization

3.1 - Check setup optimization

A - Workshop

4 - Rough-Cut Capacity

4.1 - Rough-Cut Capacity Planning

5 - Manual Scheduling

5.1 - Manual Scheduling and Optimization

5.2 - Check manual scheduling

5.3 - Check drag and drop

5.4 - Check operation update and workcenter change

6 - Capacity Reports

6.1 - Planned vs Actual Comparison Report

6.2 - Workcenter Load Report

6.3 - Production Order Load Report

6.4 - Resource Usage Report

6.5 - Responsible Load Report

B - Workshop

C - Exam
;