TRAININGS > BOM - Bill of Materials Expert Training

BOM - Bill of Materials Expert Training
150.00 + VAT
Duration 1 Day(s) / 7.0 Hour(s)
BOM.201.E
15

Eğitim ücretlerimizi iba@caniaserp.com adresine mail göndererek öğrenebilirsiniz.

OVERVIEW

MODULE DESCRIPTION

The caniasERP Bill of Materials Management (BOM) module is used to display and manage the information about the materials used in production. A bill of materials, which is a list of materials, can be considered as (to be added) a recipe defining the hierarchical structures and quantities of semi-products and/or raw materials required to produce a product. This module allows BOMs to be created, copied, modified and controlled.  

PRE-REQUISITES

Pre-Training Preparation: Logging in with the information provided for EDU jnlp

Level of Knowledge:

- BAS - Basic knowledge of Material Master

- INT - Basic knowledge of standard operations available in caniasERP

Required Materials: Notebook

TRAINING OBJECTIVES

At the end of Bill of Material - Expert Training, the participants will be able to;

- Follow product tree records on the system,

- Apply variant concepts,

- Create and view the material network.


TRAINING INDEX

BOM.201.E - BOM - Bill of Materials Expert Training


1 - BOM Management

2 - BOM General Management Processes

2.1 - Showing a Bill of Material

2.2 - Updating a Bill of Material

2.3 - Creating a New Bill of Material

2.4 - Printing a Bill of Material

2.5 - Deleting a Bill of Material

2.6 - Creating a New Bill of Material (Standart)

2.7 - Creating a New Bill of Material (Alternative)

2.8 - Creating a New Bill of Material (Variant)

2.9 - Creating a New Bill of Material (Similar)

2.10 - Creating a New Bill of Material (Demontage)

2.11 - Adding Multi Materials

2.12 - Changing Material

A - Workshop

3 - Variant Transfer Methods

3.1 - Variant Transfer: From product variant option to component variant option

3.2 - Variant Transfer: Matching

3.3 - Variant Transfer: Fixing for a Component

4 - BOM Batch Management Processes

4.1 - Search Adding/Removing Item to/from BOM

4.2 - Add Component

4.3 - Remove Component

4.4 - Changing Material

5 - Production Template Management Process

5.1 - Production Template

6 - BOM Reporting Processes

6.1 - Search Material Usage Report

6.2 - Print Material Usage Report

6.3 - Search Bill of Material Level List

B - Workshop

C - Exam
;